Flyka · Newsroom

Newsroom

Updates from the Flyka program — engineering milestones, market signals and company news.

2026.07.18

Eyes on the large model

Turning toward the large model and the road to serial production in 2030.

Read →
2026.07.08

The hours add up

Pre-production flight hours climb — redundancy holds up under real use.

Read →
2026.03.17

Proving the cost story

Pre-production builds validate the bill of materials and the path to ~$16/flight-hour.

Read →
2026.01.27

Standing up the pilot line

The pilot assembly line comes online — common parts, roughly 20x cheaper than aviation-grade.

Read →
2025.12.02

Built to travel

Fold, ship and set up by one operator without tools — designed for the real world.

Read →
2025.09.09

Reliability, measured

Tracking reliability with real numbers — component life, failure rates, redundancy saves.

Read →
2025.03.18

Faster turnaround

A reworked charging system trims turnaround time without stressing the cells.

Read →
2025.01.28

Carrying its weight

Payload flights toward the 165 kg design figure — the cluster spreads the load smoothly.

Read →
2024.07.23

A wider envelope

The tethered flight envelope widens — faster maneuvers, translation, repositioning.

Read →
2024.03.19

Closing the loop

The autonomy stack now holds position and altitude on its own — the aircraft starts to fly itself.

Read →
2024.01.30

Redundant senses

Redundant IMUs with voting mean no single sensor can mislead the flight controller.

Read →
2023.12.06

Steady as she hovers

Hover tuning — gust rejection and attitude hold — gives a calm, predictable platform.

Read →
2023.09.13

Fold, move, unfold

The folding mechanism takes Flyka from 5.4 m deployed to a 3.3 m footprint, repeatably.

Read →
2023.07.25

Loading up the airframe

The full-scale airframe passes structural load testing beyond expected flight loads.

Read →
2023.06.14

Listening to the aircraft

Per-unit real-time telemetry — temperature, current, RPM, sync — so drift is caught early.

Read →
2023.04.27

Turning watts into range

Cruise-draw and thrust tuning lift projected range; the cluster runs cool and even.

Read →
2022.07.26

A quieter motor unit

A reworked ducted-fan unit trims noise and improves cooling without losing thrust.

Read →
An air taxi for the city
2020.04.27

An air taxi for the city

This year has seen a sharp surge of interest in flying cars and air taxis, and Flyka explains why its distributed multirotor architecture is built to win that market on safety and cost.

Read →
Flyka v2 controller is ready
2019.11.27

Flyka v2 controller is ready

A round of bench testing and fine-tuning still lies ahead, yet the design is already close to final.

Read →
Flyka v2 electronic speed controller
2019.07.17

Flyka v2 electronic speed controller

It improves on the previous version with lower mass and higher efficiency, plus support for the distributed autopilot system.

Read →
Designing the new engine
2018.08.18

Designing the new engine

The new Drozd-2 engine incorporates every issue and improvement identified during testing of the first version.

Read →
For the Drozd v1 motor
2018.03.04

For the Drozd v1 motor

Development of the dual-channel electronic speed controller (ESC) is complete.

Read →
Refined the design
2018.01.24

Refined the design

In line with the new structural elements and ergonomic requirements.

Read →